Service contracts for industrial sites across East Lancashire. Annual EICRs, thermal imaging surveys, PAT testing, scheduled distribution inspection and 24-hour breakdown response for contract clients.
Every industrial electrical failure that takes down a production line has, in retrospect, been signalling its arrival for months. A loose connection heating up. A motor drawing slightly more current than it should. A failed RCD that nobody noticed because the test button hadn’t been pressed in two years. The failure isn’t sudden – it’s just unnoticed.
Planned maintenance is the mechanism for catching those signals before they become incidents. A scheduled programme of EICRs, thermal imaging, PAT testing and visual inspection picks up the early warning signs that reactive maintenance – by definition – misses entirely.
Our planned maintenance contracts are simple. An annual EICR covering all fixed installation. A six-monthly thermal imaging survey of all distribution boards, motor control centres and machine panels. PAT testing on the schedule your insurance and risk assessment requires. Emergency lighting full-discharge testing where applicable. And 24-hour breakdown response, included, for any client on a maintenance contract.
The economics are straightforward. The annual cost of a planned maintenance contract is almost always less than the cost of one significant unplanned outage. The pitch isn’t ‘maintenance is cheaper than reaction’ – it’s ‘maintenance is cheaper than reaction plus you don’t get the reaction in the first place’.
We walk the whole site, document every distribution board, motor control centre, panel, fixed installation circuit and portable appliance class. Asset register established.
Full baseline EICR plus thermal imaging survey of all electrical assets. Establishes the starting position for the contract.
Pre-agreed schedule of testing, inspection and reporting. Monthly summary of findings. Quarterly review meeting with you.
Annual review of the year's findings, asset register update, contract renewal with any adjustments.
Engineer on site within four hours of any breakdown call. Included in contract, no per-call fees.
8 /yr
Average thermal imaging findings per site per year
4 hr
Maximum response time for contract breakdown calls
78 %
Average reduction in unplanned outages after one year
100 %
Of contract clients renewed at end of first year
Depends on site size and frequency. Most small-to-medium industrial sites are £3,500-£7,500/year. We quote each contract individually after a survey. Almost always cheaper than the cost of one significant unplanned outage.
Engineer on site within four hours of your call, 24/7, 365 days a year. No call-out fee. Parts and labour for the actual breakdown are charged separately at contract rates.
Yes – one-off thermal imaging surveys are quoted separately. But contract clients get them as standard, six-monthly, included in the annual contract fee.
Yes – many clients have multiple properties under one contract. We schedule visits to cluster work geographically and report against a portfolio view.
We flag it immediately, give you a remedial quote within a week, and prioritise the rectification work. For contract clients we don’t charge a separate quote fee.
Emergency lighting is included as standard. General lighting maintenance is usually a separate maintenance schedule, included in some contracts but quoted separately for others.
Free site survey. Quote and payback figures within forty-eight hours. No pressure, no follow-up calls if it’s not for you.