Dedicated power supplies for production machinery, fabrication kit, packaging lines and process plant. Sized to the load with proper isolators, fused spurs and containment. Installed around your shifts.

A BRIEF INTRODUCTION

Why machine supplies need doing right.

new machine arrives on site. The production manager wants it running by Monday. The electrician throws a sub-main off the nearest distribution board, hangs a local isolator, and walks away. Six months later the machine is tripping intermittently, the connection has loosened from thermal cycling, and nobody can explain why.

Industrial machine supplies fail in predictable ways. Undersized cables run hot. Cheap isolators wear out. Containment held up with cable ties drops out of the ceiling void in the first heatwave. The supply that worked on day one isn’t the supply that’s still working in year three.

Sized properly, installed neatly, tested before sign-off. The machine power supplies done right is the machine power supplies that doesn’t come back as a problem in two years.

We do industrial machine supplies the way machinery manuals say they should be done – cables sized for full load current plus an allowance, isolators rated correctly with appropriate breaking capacity, proper galvanised tray or trunking on the cable run, emergency stops where the risk assessment requires them.

We also do this around your shifts. New machine power supplies usually mean a few hours of localised downtime to make the final connection. We schedule that downtime to fit your operations – most installs are made live during a planned changeover or out-of-hours window.

WHAT'S INCLUDED

Every machine power supplies job includes all of this, as standard.

01

Load assessment and cable sizing.

Calculation based on machine nameplate data, run-time and ambient. Cables sized with appropriate de-rating factors and headroom.

02

Rated isolators and protection.

Local isolators rated to the load with appropriate breaking capacity. RCBO protection where required. Surge protection on high-value machinery.

03

Galvanised containment, not cable ties.

Cable tray or trunking on every run that’s visible or accessible. Stainless screws on outdoor mountings. The detail that determines whether the install still looks like a proper job in five years.

04

Emergency stops and safety integration.

Where machinery requires emergency stop integration we install the local E-stops and wire the safety circuits. Done to your risk assessor’s spec.

05

Out-of-hours final connections.

The final make-live is scheduled around your shifts. Most installs are connected during planned changeover, weekend windows or short controlled downtime – never in the middle of a production run.

06

Testing and minor works certification.

Every supply tested for insulation resistance, polarity, loop impedance and RCD operation. Minor works certificate issued before we leave site.

THE PROCESS

How a typical install actually works.

DAY 1 · SURVEY
Machine arrival and routing assessment.

We walk the proposed location, identify the nearest suitable supply, measure cable run, identify containment route and assess any safety integration requirements.

01
DAY 1 · SURVEY
DAYS 2-3 · QUOTE
Written quote with options.

Quote covers cable, containment, isolator, protection, testing and certification. Where there are routing options both are priced.

02
DAYS 2-3 · QUOTE
PRE-INSTALL · SCHEDULING
Downtime window agreed.

Final connection window scheduled around your shifts - usually a planned changeover, weekend or short out-of-hours window. Cable and containment go in live.

03
PRE-INSTALL · SCHEDULING
04 INSTALL · 1-3 DAYS
Cable, containment, isolator and connection.

Cable run installed in containment, isolator mounted, final connection made during the agreed downtime window. Machine commissioned and load-tested.

04
04 INSTALL · 1-3 DAYS
SIGN-OFF · SAME DAY
Certification and handover.

Minor works certificate issued, supply schedule updated at the distribution board, isolator labelled, warranty documentation provided.

05
SIGN-OFF · SAME DAY

TYPICAL FIGURES

What an average industrial supply install typically involves.

Figures from machine supply installs across East Lancashire manufacturing sites over the past twelve months.
 

CABLE RUN TYPICAL

18 m

Average cable run from existing distribution to machine

LOAD RATING TYPICAL

32 A

Most common machine supply rating – single or three-phase 32A

DOWNTIME PLANNED

2 hr

Typical final-connection downtime window required

CONTAINMENT

100 %

Galvanised tray or trunking – never cable ties

COMMON QUESTIONS

Questions we get a lot.

A typical single machine supply with a moderate cable run is two days – one for cable and containment install, one for final connection and testing. Larger machines or longer runs scale up from there.

Cable runs and containment can almost always go in while the line is running. Final connection requires a short isolation window – usually a couple of hours, scheduled around your operations.

If the new machine takes the building’s total load above existing supply capacity we’ll lodge the DNO application and handle the liaison. DNO lead times are typically 4-8 weeks.

Yes – where the machine safety case requires interlocked isolators we install those and wire the safety circuit per your risk assessment.

We size cables based on full load current per BS 7671, with appropriate de-rating factors for ambient temperature, run length, grouping and method of installation. Usually one cable size up from absolute minimum, for thermal headroom.

Yes – most production machinery is three-phase. We do single-phase and three-phase machine supplies as standard. See our separate page on 3-phase installations for new supply work.